P6 Foresight Live Primavera P6 masterclass. Which activities drive handover? What happens when one slips?

Starts
Duration
Six weeks
Delivery
Live online
Fee
£1,000 GBP

Apply without paying, or register and pay through Stripe. Both start with the same short form.

Six weeks of live online teaching for planners and project controls professionals. Build a programme in Primavera P6, test the logic behind it and explain your forecast to a project team.

Alderbank Pumping Station in the 3D teaching model. The primary steel frame and crane runways stand on the finished foundations. Caption in the frame: milestone 2 of 7, Erect primary steel and runways.

Seven milestones 22.5 seconds no sound

  1. 01 Construct foundations
  2. 02 Erect primary steel and runways
  3. 03 Create equipment workfaces
  4. 04 Enclose the first three zones
  5. 05 Lift the overhead bridge into Z4
  6. 06 Install and connect the services
  7. 07 Hand over the facility
Alderbank Pumping Station, a 3D teaching model by The True Troop. Selected milestones show how foundations, steelwork and equipment access lead to the crane lift, installation and handover.

Your six-week class calendar.

All sessions are live online. All times are UK time (GMT).

Live classes
Mondays, Tuesdays and Wednesdays
8pm to 10pm
Clinics
Saturdays
7:30am

Every class and clinic is recorded. You’ll have access to all recordings for at least one year.

1 February – 13 March 2027
WeekMonTueWedSatClinic
1
2
3
4
5
6

Who it’s for

Three starting points, one syllabus.

The programme starts with fundamentals and builds towards more advanced controls. Everyone follows the same syllabus. These are the topics each kind of applicant is likely to practise most.

The programme

What you’ll work on in Primavera P6.

Explore 28 core topics and practical exercises from our Pathfinder and Capstone classes. Past workshops used a culvert pipeline, a data-hall envelope and a multi-zone EV charging hub to teach the handovers that drive a programme.

Part 1 Topics 01–05

Project setup

What you do Set up a project from enterprise data down to coded activities and milestones.

  1. 01Enterprise data and project-specific data in P6
  2. 02Enterprise project structure (EPS) and organisational breakdown structure (OBS)
  3. 03Creating a project, setting dates and assigning project codes
  4. 04Work breakdown structure (WBS)
  5. 05Activities, milestones and activity codes
Show exercisesHide exercises Scope breakdown, Excel imports and XER transfer
  • Scope to WBS Turn a client brief into work packages, activities and handover milestones. Record what falls outside the scope.
  • Excel to P6 Prepare activity IDs, WBS codes and predecessor links in Excel. Import them and check that each activity has the intended links.
  • XER project transfer Export a native P6 project, check version compatibility and choose whether an import should create, update or replace a project.

Part 2 Topics 06–10

Scheduling logic

What you do Link the activities, calculate early and late dates, see what constraints do to total float and test proposed changes in a reflection project.

  1. 06Finish-to-start, start-to-start, finish-to-finish and start-to-finish relationships
  2. 07Forward and backward passes to calculate early and late dates
  3. 08Date constraints and their effect on total float
  4. 09Reflection projects for testing proposed schedule changes
  5. 10Grouping, filtering and exporting custom layouts
Show exercisesHide exercises Free float, logic loops and recovery
  • Network diagrams Calculate free and total float by hand. Test whether delaying one activity moves its successor, the handover milestone or both.
  • Logic checks Trace driving predecessors, find a circular link and distinguish a curing lag from spare time. Compare fast-tracking with crashing when a finish date slips.
  • Mixed calendars Model concrete curing over a weekend. Compare continuous time with the working calendar and check the resulting dates and float.

Part 3 Topics 11–16

Resource planning

What you do Set up resources and roles, load them onto activities, then read the histograms and resolve over-allocation and conflicts.

  1. 11Setting up labour, material and equipment resources and defining roles
  2. 12Assigning roles to activities
  3. 13Loading resources, setting units and applying resource curves
  4. 14Using Global Change to update multiple activities
  5. 15Reading stacked resource histograms and identifying over-allocation
  6. 16Resolving resource conflicts across projects
Show exercisesHide exercises Crew costs, duration types and calendars
  • Duration estimates Compare a quantity-and-productivity estimate with a three-point PERT estimate. Change the working week and check its effect on the finish date.
  • Resource loading Calculate crew hours and cost from units per day. Compare fixed-duration and fixed-unit settings, then check which calendar drives a resource-dependent activity.
  • Rates and expenses Price labour, equipment and materials for a work package. Recalculate assignment costs after a rate change and record a direct expense separately.

Part 4 Topics 17–22

Progress and control

What you do Update the programme against a baseline, deal with out-of-sequence progress and trace the float paths that threaten completion.

  1. 17Creating user-defined fields for project reporting
  2. 18Updating out-of-sequence work with retained logic and progress override
  3. 19Tracing multiple float paths and finding activities that threaten completion
  4. 20Using activity usage profiles to review time-phased costs and resources
  5. 21Assigning baselines and measuring schedule variance
  6. 22Building UK working calendars for shifts and public holidays
Show exercisesHide exercises Data dates, weighted progress and look-aheads
  • Progress updates Move the data date and compare duration, units and physical percent complete. Diagnose a blank schedule variance when the baseline has yet to be assigned.
  • Look-ahead reporting Use Progress Spotlight and data-date filters to build two-, four- and sixteen-week look-aheads. Exclude completed work so the site team can see what comes next.
  • Weighted activity steps Use weighted steps to measure physical progress. Check actual dates, remaining duration and expected finish, including what changes when work is suspended and resumed.
  • Level of effort and WBS summaries Link site supervision to the work it supports. Compare its dates with those of a WBS summary activity.

Part 5 Topics 23–25

Performance and assurance

What you do Report performance with S-curves and earned value, and check schedule quality against the DCMA 14-point assessment.

  1. 23Building S-curves, demand histograms and project controls dashboards
  2. 24Earned value management, CPI, SPI and forecasts at completion
  3. 25Checking schedule quality with the DCMA 14-point assessment
Show exercisesHide exercises Month-end comparisons and client reports
  • Programme revisions Match activity IDs across monthly Excel exports with VLOOKUP. Identify added or deleted activities and distinguish movement since last month from variance against the baseline.
  • Performance reporting Chart cumulative planned value, earned value and actual cost. Use key milestones and a resource S-curve to explain what changed in the reporting period.
  • Issue a programme PDF Set the Gantt timescale, page breaks, headers and revision details so a client can read the key dates and baseline bars on the issued programme.
  • XER quality review Check open ends, relationship lags, calendar exceptions and unusually high or negative float. Verify each flagged activity in P6.

Part 6 Topics 26–28

Delay, contracts and applied work

What you do Three items in three formats. Study the recorded delay analysis, build and present the capstone programme, and listen to the NEC4 podcast.

  1. 26Recorded delay analysis covering windows analysis, as-planned versus as-built, impacted as-planned and collapsed as-builtFormat: recorded
  2. 27UK infrastructure capstone. Build a programme, assess risk and resources, and present it to a mock client panel.Format: applied capstone
  3. 28Supplementary NEC4 podcast covering programmes, early warnings, compensation events, float and time-risk allowancesFormat: supplementary podcast
Show exercisesHide exercises Contractor interfaces and concurrent delay
  • Integrated master schedules Baseline each contractor’s programme, then link the interfaces. Distinguish milestones that drive the next trade from reporting milestones and trace the effect on testing and handover.
  • Delay assessment Distinguish a prospective assessment from a retrospective one. Use the programme and progress records to examine overlapping delays, terminal float and time-risk allowances.
  • Model a delay event Log the event’s start and finish in user-defined fields. Insert the delay into the schedule, revise the links and show whether it consumes float or moves completion.
Illustration of Dr Francis A. Osadare in a navy jacket beside a Primavera P6 schedule on a wall screen, with learners seated in the foreground
AI-assisted classroom illustration based on Dr Osadare’s portrait. It is not a photograph of a session. The February cohort is taught live online. The True Troop

Your instructor

Dr Francis A. Osadare

Francis founded The True Troop Consulting. In the live sessions, he works through the reasoning behind scheduling decisions alongside the steps you’ll take in Primavera P6.

PMP
Project Management Professional
PMI-SP
PMI Scheduling Professional
MSc
Project Management
LLM
Construction Law & Adjudication

The syllabus runs from scheduling technique to delay analysis and NEC4. His credentials cover the same span.

Masterclass resources

Try the material now. Practise before we start.

The resource hub is a separate True Troop site, built around the original P6 masterclass. Open the class files, explore the planning toolkit and watch the teaching before you decide, or use it to get some practice in before February.

Explore masterclass resources

Before you go: prices, dates and offers shown on the hub are for earlier cohorts and other programmes. For P6 Foresight in February 2027, this page is the source: £1,000 GBP, starting Monday 1 February.

  • Class filesWork through practical scheduling exercises.
  • Planning toolkitUse tools for everyday planning and project controls. Some ask you to register.
  • Videos and recordingsExplore the wider masterclass library. Some titles from earlier programmes are sold separately.

The fee

What the £1,000 covers.

£1,000 GBP

Stripe collects the £1,000 course fee for OSADARE LTD. Your available payment methods appear at checkout.

3 interest-free instalments with Klarna

Borrowing more than you can afford or paying late may negatively impact your financial status and ability to obtain credit. Subject to status. Ts&Cs and late fees apply.

Read Klarna’s UK terms

Can’t pay with Klarna? Contact support for account details to pay directly.

Starts
Duration
Six weeks
Delivery
Live online
  • Six weeks of live online teaching with Dr Francis A. Osadare, including three evening classes and a Saturday morning clinic each week.
  • At least one year of access to recordings of every February cohort class and clinic.
  • The 28-topic syllabus set out above, from project setup to earned value and schedule assurance.
  • Recorded delay analysis, from windows analysis to collapsed as-built.
  • The applied capstone, built, assessed and presented to a mock client panel.
  • The supplementary NEC4 podcast on programmes, early warnings and compensation events.

Joining details

Admissions will email your joining instructions before the first class. See all six weeks of class dates.

Ask before you pay

For questions about your registration or recording access, email support@thetruetroop.com.

February 2027 cohort

Apply or register for February.

One short form serves both routes. Each button says what it does, and neither does more than it says.

What confirms your place

  1. Application saved By either button. If you apply, we email your February receipt with a link back to it.
  2. Payment verified Pay the £1,000 GBP course fee through Stripe when you register, or open checkout later from your application email.
  3. Place confirmed By a separate email, once Stripe verifies the payment.

A submitted form or a return from Stripe does not confirm a place.

Questions about the programme? Email admissions.

Before you decide

Questions about joining.

Who is the course for?

It’s for planners, project controls professionals and anyone who needs to build and manage project schedules in Primavera P6. The programme starts with fundamentals and builds towards more advanced controls.

Do I have to apply before I register?

No. Both buttons use the same form. Apply saves your application without payment. Register saves it and takes you straight to checkout.

When is my place confirmed?

Submitting your form saves your application. Complete the £1,000 payment through Stripe and look for a separate email confirming your February registration. Returning from Stripe to this site does not confirm payment by itself.

Where can I see my payment options?

Stripe checkout shows the payment methods available for the £1,000 fee. If Klarna is offered, you’ll see the amount due today and the remaining payments before you agree. View payment options. If you can’t pay with Klarna, contact support for account details.

When are the classes and clinics?

Classes run on Mondays, Tuesdays and Wednesdays from 8pm to 10pm UK time. Saturday clinics start at 7:30am UK time. See every class date. Admissions will email joining instructions before the first class.

Can I catch up if I miss a session?

Yes. Every live class and Saturday clinic is recorded, and your course fee includes access to all the recordings for at least one year.

What if my question isn’t answered here?

Email admissions at support@thetruetroop.com before you pay.

Try a P6 masterclass.

Explore the planning toolkit, class files and recorded teaching from earlier cohorts. You can return here for February dates and registration.

Explore masterclass resources